The BA51 Logistic Center condominium is located on BA-512 Highway. The development is close to Salvador Airport and easily accessible from the city. The project will consist of 4 blocks with loading docks, a clear height of 12 meters, a floor resistance of 6 tons per square meter, sprinklers, hydrants, column spacing of 21.2 meters by 22 meters, natural lighting, a generator, thermal and acoustic insulation. Additionally, the infrastructure of the development will provide 24-hour security, a bulletproof entrance, and CCTV, kitchens and restaurants, dressing rooms, recreational areas, driver support, and a spacious maneuvering yard. This development is expected to be completed in 2030.
| Property Type | Vacant Area (m²) | Availability | Request |
|---|---|---|---|
| Industrial | 1- 0.00 | Negotiable |
|